Scissor Lift With Transport Base Used To Disassemble Nuclear Site
Introduction
Tork T3 scissor lift with mobile features used to disassemble former nuclear site.
Project Challenge
Zion Solutions, an energy solutions company specializing in the disposal of nuclear material required a lift that could be used to support a 25,000 lb. load at 18 feet travel to access areas that a forklift could not.
Our Solution
Tork T3 scissor lift with transport base and tow hitch (self-contained DC power tug capable of towing 50,000 pounds), visible pressure gauge and on board power unit. The workers will attach the powered tug to the receiver on the lift and then position the lift under the structure. The workers will then raise the lift to support the structure while it is being disassembled. They will then lower the material to the ground and tow the lift to the unloading zone for the careful removal of the nuclear remnants.
AQ Project Ref. #114478 9SPL-20390
The Results
Autoquip’s specialization in custom features to meet the application requirements provided the customer with the most reliable and durable lift to assist in accomplishing the dissembling task.